ORLANDO, FL – 10701 CENTRAL POINT DRIVE

A modern, high bay, rail-served distribution facility, 10701 Central Port Drive is located in Central Florida’s most sought-after industrial parks. It’s proximity to all major highways makes this facility ideally suited to satisfy any logistical need in the Southeast.

PROPERTY SPECIFICATIONS:

Use: Distribution warehouse
Stories: One-story and mezzanine
Site Size: 44.46 acres
Building Size: 555,00 square feet
Construction: Precast and metal panels
Year Built/Renovated: Built in 1998
Roof: Standing seam metal on bar joist
Clear Height: 55’ warehouse, 12 to bottom of mezzanine, 20.5 mezzanine to deck
Bay Size: 30′ x 50′ – high bay; 50′ x 60′ – low bay; 33 pit load levelers
Loading:: 91 tailboard – 8 by 9
HVAC: Warehouse – EK Campbell air rotation, gas-fired with exhaust fans, Office – rooftop HVAC units
Fire Protection: Wet system
Fire Alarm: Fully monitored fire alarm system
Electric: 4,000-amp@480-volt primary
Utilities Public water, sewer, gas and electric
Rail Service 8 rail 12 by 9, 1 drive in 15 by 15
Parking 246 automobile and 285 truck spaces
Elevator Serving mezzanine office area